UWO University Drive Bridge Replacement

Closed - Request for Proposal (Results - Not Available)
Public
9M5173
0048121521
University Drive,  London ON
(Middlesex) , Canada
Heavy/Civil
Heavy/Highway/Utilities
Bridges/Pedestrian Bridges
January 17, 2022 2:00 PM   -  
Extended from January 11, 2022
Estimate Not Available

Western University is seeking proposal for engineering design services for the replacement of the University Drive Bridge. The existing structure was built in 1923 to carry two lanes of east-west University Drive traffic over the north branch of the Thames River. Located within the Western University campus the existing structure is a three-span riveted plate girder bridge measuring a 296 ft (90.2 m) long with a centre span of 130 feet (39.6 m) and equal end spans measuring 83 feet (25.3 m).

Tucker J Morton
Phone: 519-661-2111 ext. 80569
Email: tmorton4@uwo.ca

Questions Deadline: January 13, 2022 at 4:00pm

University of Western Ontario (UWO)  -  Merx Document Availability

DOW's
Division 31 - Earthwork
Earthwork
Division 32 - Exterior Improvements
Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties
Division 33 - Utilities
Utilities
Division 34 - Transportation
Transportation, Bridges
Confirmed By Brennen Kliffmueller
First Reported Wednesday, December 15, 2021